Yesterday the builders finished putting on the Galvalume roof, which finished the drying-in phase.  The following pictures show where we are now.  This view is looking NW.  Notice the upstairs windows (south wall) are shaded by the roof overhang.  The downstairs windows and door will be shaded by the greenhouse roof.  In the winter, the sun will illuminate the upstairs windows.

This is a view from the driveway.  Notice the butterfly fluttering by.

This is a view from the livingroom looking up to the loft.  The bathroom is at the bottom right and the corner of the kitchen is at the bottom left.

Below is looking into the kitchen from the livingroom.  The kitchen is about 20 ft by 9.5 ft.  At the left is a half wall to the diningroom.  The doorway in the foreground will be left open and the woodstove will be right in front of the wall to the right.

Below is looking from the livingroom toward the diningroom and the stairs to the loft.

This is the loft.  At the far end will be the bedroom and the study will be at the top of the stairs.

This is looking downstairs from about halfway down the stairs.  The livingroom is at the lower right.

This is the bathroom as viewed from the livingroom.  The bathroom is about 7 ft by 10 ft.

The next phase will be installing the Certainteed fiber cement board siding and building the porch on the north side.  The siding is comprised of 4 ft by 10 ft panels that weigh about 100 lb. each!  We will take a couple of weeks breather before starting the next phase.  Meanwhile, we will be caulking and sealing and taping the walls, and waterproofing the concrete block walls of the basement.  After the basement walls are waterproofed and french drains installed, we will have dirt backfilled up to a bit above ground level.  Stay tuned . . .